Guide
A plain spreadsheet template you can download, and the order of work that makes it fill in fast.
Download the rehearsal schedule template (CSV) — it opens in Google Sheets, Excel or Numbers. One row per rehearsal: date, start, end, type, scenes, who’s called, and notes. It is deliberately boring. The work is in deciding what goes in each row, and that is what the rest of this page is about.
You need three things, and you probably have all of them already:
Fill the Date, Start and End columns for every rehearsal in the window before you schedule a single scene. Mark blackout dates as removed rather than leaving gaps — gaps get filled by accident. Then mark tech week: every row from tech start to opening is type Tech and the called column says “Full company”. Count what’s left. That count is your budget, and it is always smaller than you think.
Next, take the last two or three rehearsals before tech and mark them Run. Run-throughs belong at the end, after every scene has been worked enough that a run teaches something. Everything in between is scene work.
Go through your breakdown and give every scene a minimum number of rehearsals — three is a reasonable floor for community and school theatre. Heavy scenes (the long two-handers, the big ensemble numbers, the fight) get four or five. Then place them in this order:
If the director has set off-book dates, check each act’s scenes have had their minimum before that date. Asking actors to be off book for a scene they’ve rehearsed once is how off-book dates quietly slide.
The single most appreciated thing a stage manager can do is not waste people’s evenings. Within a rehearsal, order the scenes so the people in them overlap: if Maya is in 1.2 and 2.4, put those back to back and give her a 6:30–8:00 call instead of 6:30–9:30 with an hour sitting in the hall. Write individual call times in the Called column — “Maya 6:30–8:00; Jordan 7:15–9:30” — rather than one time for everyone.
Only call the people you need. Volunteers notice when their night was respected, and they come back.
Before you publish the schedule, go row by row and check every called name against their conflicts. Hard conflicts mean they can’t be called at all; soft ones (“prefers not”) can be overridden if you must, but count how often. If a scene needs two people who are never free at the same time, you’ll find out here — better in week one than in week five. The fixes are always one of: add a rehearsal, ask whether one conflict is really soft, split the scene into French scenes so smaller groups can work it, or rehearse with a stand-in.
The schedule is the plan; the nightly call notice is what people actually read. Keep it short and the same every time: date, time, place, the scenes being worked, who’s called (with their times), who isn’t, and anything to bring. When a conflict changes, re-cut the affected nights, tell only the people whose calls moved, and update the shared copy.
Everything above is what the Tonight’s Call planner does from your breakdown and conflicts: it lays out the rows, places heavy scenes early, groups scenes that share actors, puts run-throughs at the end, never calls anyone into a hard conflict, explains any scene it can’t fit, and drafts the nightly notice. The CSV export matches this template’s columns, so you can still finish it in your spreadsheet.